CarteparcelleMapFrançais

Parcel 38136 000 ZA 35

Crachier (38136), section ZA

Recorded area
8,550 m²
PLU zone
AAgricultural zone (A)
38136 000 ZA 1038136 000 ZA 1338136 000 ZA 2838136 000 ZA 2938136 000 ZA 3038136 000 ZA 3138136 000 ZA 3238136 000 ZA 3338136 000 ZA 3438136 000 ZA 3538136 000 ZA 3638136 000 ZA 3738136 000 ZA 3838136 000 ZA 7238136 000 ZA 7438136 000 ZA 10238136 000 ZA 10938136 000 ZA 14638136 000 ZA 14938136 000 ZA 16238136 000 ZA 167
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

A – Agricultural zone (A)

Protected farmland: building is strictly limited.

100% of the parcel
Document: 38136_PLU_20191014

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Crachier

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Building restricted (environment, risks, public interest)
Secteur de risques technologiques lie au pipeline Transugil Ethylene SUP1 – 100% of the parcel
No building (environment, risks, public interest)
Secteur avec conditions speciales de constructibilite : Retrait gonflement des sols argileux – 100% of the parcel
Development guidelines (OAP)
Secteur d'Orientations d'Amenagement et de Programmation Mise en valeur de la trame verte et bleue – 100% of the parcel
Ecological corridor (green and blue network)
Corridor ecologique – 100% of the parcel
Building restricted (environment, risks, public interest)
Secteur SUP1 liee a la canalisation de transport de matiere dangereuse Transugil Ethylene – 10% of the parcel
Building under conditions (environment, risks, public interest)
Risque de retrait gonflement des sols argileux - zone faiblement a moyennement exposee – 10% of the parcel
Building under conditions (environment, risks, public interest)
Secteur d'assainissement non collectif – 10% of the parcel
Development guidelines (OAP)
Secteur d'orientation d'amenagement et de programmation – 10% of the parcel
Ecological corridor (green and blue network)
Corridor ecologique – 10% of the parcel

Documents on the Géoportail de l'Urbanisme: document 1, document 2

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Sanitation zoning
Alimentation en eau potable – 100% of the parcel
Sanitation zoning
Secteur d'assainissement non collectif – 100% of the parcel
Sanitation zoning
Zonage assainissement – 100% of the parcel
Other information
Dechets – 100% of the parcel
Other information
Defense incendie – 100% of the parcel
Other information
Reseau d'electricite – 100% of the parcel
Sanitation zoning
Reseaux d'alimentation en eau potable – 10% of the parcel
Sanitation zoning
Zonage d'assainissement collectif – 10% of the parcel
Other information
Defense incendie – 10% of the parcel
Other information
Ordures menageres – 10% of the parcel
Other information
Reseau d'electricite – 10% of the parcel

Documents on the Géoportail de l'Urbanisme: document 1, document 2

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Power lines
11% of the parcel

See the document on the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 3 (moderate)
Radon potential
Category 1 (low)

Details

Cadastral reference
38136 000 ZA 35 (38136000ZA0035)
Commune
Crachier (38136)
Prefix
000
Section
ZA
Number
35
Recorded area (contenance)
8,550 m²
Computed area
8,492 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (38136_PLU_20191014)

PLU zones (share of parcel area):

Neighbouring parcels

Previous parcel: 38136 000 ZA 34Next parcel: 38136 000 ZA 36