CarteparcelleMapFrançais

Parcel 38118 000 AC 86

Colombe (38118), section AC

Recorded area
1,731 m²
PLU zone
UBaUrban zone (U)
38118 000 AC 5538118 000 AC 7138118 000 AC 7238118 000 AC 7438118 000 AC 7938118 000 AC 8038118 000 AC 8138118 000 AC 8638118 000 AC 9838118 000 AC 34238118 000 AC 47738118 000 AC 47838118 000 AC 47938118 000 AC 48538118 000 AC 51438118 000 AC 51538118 000 AC 51638118 000 AC 51738118 000 AC 51838118 000 AC 53638118 000 AC 53738118 000 AC 53838118 000 AC 53938118 000 AC 54938118 000 AC 55038118 000 AC 55138118 000 AC 55238118 000 AC 61238118 000 AC 61338118 000 AC 67138118 000 AC 67238118 000 AC 67338118 000 AC 82938118 000 AC 88238118 000 AC 88338118 000 AC 88438118 000 AC 90438118 000 AC 90538118 000 AC 90638118 000 AC 90738118 000 AC 90838118 000 AC 105238118 000 AC 105338118 000 AC 105438118 000 AC 1055
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

UBa – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

100% of the parcel
Document: 243801073_PLUI_20260202

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

All addresses in Colombe

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Retail diversity to protect or develop
Centralité commerciale (CC) / Périmètre CC – 100% of the parcel
Retail diversity to protect or develop
Périmètre de la centralité commerciale correspond également au périmètre d'implantation du commerce / Périmètre PIC = Périmètre… – 100% of the parcel
Building placement rules
Ligne de recul "fonds de parcelles" (OAP frange agricole) / Ligne de recul de 6 mètres minimum des constructions vis à vis de l… – line on the parcel or its boundary

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Sanitation zoning
Assainissement – 100% of the parcel
Other information
Espace préférentiel de développement – 100% of the parcel
Other information
Périmètre indicatif autour des bâtiments agricoles - 100 mètres – 100% of the parcel
Other information
Périmètre indicatif autour des bâtiments agricoles - 50 mètres – 70% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 3 (moderate)
Radon potential
Category 1 (low)

Details

Cadastral reference
38118 000 AC 86 (38118000AC0086)
Commune
Colombe (38118)
Prefix
000
Section
AC
Number
86
Recorded area (contenance)
1,731 m²
Computed area
1,743 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Intermunicipal zoning plan (PLUi) (243801073_PLUI_20260202)

PLU zones (share of parcel area):

Neighbouring parcels

Previous parcel: 38118 000 AC 81 – 7 Chemin des Chaumes, 38690 ColombeNext parcel: 38118 000 AC 90