CarteparcelleMapFrançais

Parcel 30342 000 AB 450

Vénéjan (30342), section AB

Recorded area
2,821 m²
PLU zone
AAgricultural zone (A)
30342 000 AB 36330342 000 AB 36730342 000 AB 43930342 000 AB 45030342 000 AB 451
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

A – Agricultural zone (A)

Protected farmland: building is strictly limited.

100% of the parcel

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Building restricted (environment, risks, public interest)
MARGE : Bande comprise entre 10 m et 20 m comptes a partir du haut des berges des cours d'eau permanents ou non permanents dans… – 10% of the parcel
Building restricted (environment, risks, public interest)
MARGE : Bande de 10 m comptes a partir du haut des berges des cours d'eau permanents ou non permanents ou toute construction, c… – 2% of the parcel

See the document on the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Draft risk prevention plan
SEISME : Zone de sismicité (aléas modéré) – 100% of the parcel
Draft risk prevention plan
ZI : Zonage PSS Rhône Amont zone complémentaire (b) – 100% of the parcel
Draft risk prevention plan
ARGILE : Retrait-gonflement des argiles (aléas faible) – 66% of the parcel

See the document on the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Power lines
59% of the parcel

See the document on the Géoportail de l'Urbanisme

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
High exposure (80% of the parcel), medium (20%)
Risk prevention plan
Natural or mining risk plan (PM1) – 100% of the parcel
Seismic zone
Zone 3 (moderate)
Radon potential
Category 1 (low)

Details

Cadastral reference
30342 000 AB 450 (30342000AB0450)
Commune
Vénéjan (30342)
Prefix
000
Section
AB
Number
450
Recorded area (contenance)
2,821 m²
Computed area
2,889 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (3034220160325)

PLU zones (share of parcel area):

Neighbouring parcels

Previous parcel: 30342 000 AB 443Next parcel: 30342 000 AB 451