CarteparcelleMapFrançais

Parcel 26100 000 A 303

Combovin (26100), section A

Recorded area
55 m²
PLU zone
UaUrban zone (U)
26100 000 A 25926100 000 A 26026100 000 A 30026100 000 A 30126100 000 A 30226100 000 A 30326100 000 A 30426100 000 A 30526100 000 A 30626100 000 A 30726100 000 A 31326100 000 A 41826100 000 A 47226100 000 A 47626100 000 A 47726100 000 A 479
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

PLU zoning

Ua – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

100% of the parcel
Document: 26100_PLU_20200213

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
2 buildings
1 of them also stands on other parcels; dwellings are counted for the whole building
Use
Residential
Height to the eaves
up to 8.1 m
Storeys
up to 2 (ground floor included)
Dwellings
2
Built
before 1901 – after 1999

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Medium exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 4 (medium)
Radon potential
Category 1 (low)

Details

Cadastral reference
26100 000 A 303 (261000000A0303)
Commune
Combovin (26100)
Prefix
000
Section
A
Number
303
Recorded area (contenance)
55 m²
Computed area
45 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

Planning document
Local zoning plan (PLU) (26100_PLU_20200213)

PLU zones (share of parcel area):

Neighbouring parcels

Previous parcel: 26100 000 A 302Next parcel: 26100 000 A 304