CarteparcelleMapFrançais

1 Rue du Four, 08300 Avançon

Parcel 08038 000 F 171 · section F

Recorded area
865 m²
PLU zone
UCUrban zone (U)

Address from France’s national address register (BAN), associated with this parcel for information only. Addresses and how they are linked

08038 000 F 6008038 000 F 6108038 000 F 9908038 000 F 10408038 000 F 10508038 000 F 10608038 000 F 10708038 000 F 10808038 000 F 10908038 000 F 11108038 000 F 11208038 000 F 11308038 000 F 11408038 000 F 11508038 000 F 12208038 000 F 12408038 000 F 16108038 000 F 16208038 000 F 16808038 000 F 16908038 000 F 17008038 000 F 17108038 000 F 17308038 000 F 17408038 000 F 17508038 000 F 17608038 000 F 17708038 000 F 23308038 000 F 27608038 000 F 27808038 000 F 27908038 000 F 28608038 000 F 28808038 000 F 28908038 000 F 29008038 000 F 29708038 000 F 29808038 000 F 30808038 000 F 30908038 000 F 31008038 000 F 31108038 000 F 31208038 000 F 35908038 000 F 39608038 000 F 421
The parcel (coloured) and its neighbours, from the cadastre.
The cadastre is a tax record: it does not prove ownership. Why?

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

Understanding the map information

PLU zoning

UC – Urban zone (U)

Built-up or serviced area. Building is generally allowed, under the PLU rules.

100% of the parcel
Document: 200043156_PLUi_20260114

Addresses

Source: Base Adresse Nationale (national address register). “Linked by its position”: the address point lies inside the parcel. “Linked by its building (RNB)”: the building that carries the address in the national building register (Référentiel National des Bâtiments) stands on the parcel. “Linked by IGN (BAN PLUS)”: IGN matches the address to this parcel, the nearest one on the same side of the street, and the address point lies inside it. In these cases the Base Adresse Nationale declares no link.

All addresses in Avançon

Local plan prescriptions

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Local plan information

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Listed monument and its surroundings
Eglise Saint-Rémy – 100% of the parcel
Listed monument and its surroundings
Périmètre délimité des abords de l'église – 100% of the parcel

See the document on the Géoportail de l'Urbanisme

Buildings

Indicative data (IGN BD TOPO): buildings IGN links to the parcel (BAN PLUS) when they cover at least 20 m² of it, with information from the tax files (DGFiP), anonymised. An unknown height or number is not shown. Construction years are grouped into periods, because old buildings often carry an estimated round year (1800, 1900…). A building standing on several parcels is counted on each, with all its dwellings. Recent buildings may be missing: the tax files are updated with a delay.

On the parcel
3 buildings
Height to the eaves
up to 5.4 m

Risks

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

Clay shrink-swell
Low exposure (100% of the parcel)
Risk prevention plan
Not recorded in the Géoportail de l'Urbanisme
Seismic zone
Zone 1 (very low)
Radon potential
Category 1 (low)

Details

Cadastral reference
08038 000 F 171 (080380000F0171)
Commune
Avançon (08038)
Prefix
000
Section
F
Number
171
Recorded area (contenance)
865 m²
Computed area
878 m² Computed from the plan, may differ from the recorded area.

Planning in this commune

No planning document published on the Géoportail de l'Urbanisme.

PLU zones (share of parcel area):

Neighbouring parcels

Previous parcel: 08038 000 F 170Next parcel: 08038 000 F 173