CarteparcelleMapFrançais

Parcel 04075 000 C 101

Entrepierres (04075), section C

The cadastre is a tax record: it does not prove ownership and its boundaries have no legal force (only a surveyor's boundary marking does). Its plan is approximate: especially where it is old, it can be offset by a few metres from the buildings and the aerial imagery. The owner's name is not shown. Boundary marking (Service Public, in French)

04075 000 C 4504075 000 C 4804075 000 C 9304075 000 C 9704075 000 C 9804075 000 C 9904075 000 C 10004075 000 C 10104075 000 C 10204075 000 C 10304075 000 C 10404075 000 C 10504075 000 C 10704075 000 C 10804075 000 C 10904075 000 C 11004075 000 C 11104075 000 C 12904075 000 C 13004075 000 C 312
The parcel (coloured) and its neighbours, from the cadastre.

View on the map

Details

Cadastral reference
04075 000 C 101 (040750000C0101)
Commune
Entrepierres (04075)
Prefix
000
Section
C
Number
101
Recorded area (contenance)
2,080 m²
Computed area
2,274 m² Computed from the plan, may differ from the recorded area.

Addresses

No address from the Base Adresse Nationale is linked to this parcel.

PLU zoning

N – Natural and forest zone (N)

Protected natural areas, forests and landscapes: building is strictly limited.

100% of the parcel

Local plan prescriptions

Not recorded in the Géoportail de l'Urbanisme

Local plan information

Not recorded in the Géoportail de l'Urbanisme

Public-utility easements

Not recorded in the Géoportail de l'Urbanisme

For guidance only, from the Géoportail de l'Urbanisme extraction of 15 August 2026; the linked document may have been replaced since. Only the planning document's regulations and annexes are binding. A missing item means “not recorded”, not “no constraint”.

Risks

Clay shrink-swell
Not recorded
Risk prevention plan
Natural or mining risk plan (PM1) – Plan de prévention des risques naturels prévisibles de la commune d’Entrepierres – 100% of the parcel
Seismic zone
Zone 4 (medium)
Radon potential
Category 2 (low, with geological factors that can ease the transfer of radon)

Some clay soils swell when wet and shrink as they dry, which can crack buildings. The higher the exposure, the more building precautions are needed. A risk prevention plan (PPR) maps the areas exposed to a hazard (flooding, ground movement, an industrial site…) and sets building rules there. The Géoportail de l'Urbanisme does not list every plan yet.

This information is for guidance only and has no regulatory force: it does not replace the risk statement (état des risques, ERRIAL) to be attached to a sale or a rental, which anyone can produce free of charge on Géorisques.

Produce the risk statement (ERRIAL) on Géorisques · Risks near an address (Géorisques)

Planning in this commune

Planning document
Local zoning plan (PLU) (0407520140916)

PLU zones (share of parcel area):

Neighbouring parcels

Previous parcel: 04075 000 C 100 · Next parcel: 04075 000 C 102